White Oak Medical Center
Central Utility Plant

Central utility plant shell built for a new hospital campus with more than 50 contractors working around it

Project Size
$4.1 Million
Location
White Oak Medical Center, Silver Spring, MD
Owner
Edison Energy for Adventist HealthCare
Completed
August 2019
Total Contractors On-Site
Over 50
Construction workers in safety vests building a steel-framed commercial structure with lifts and an American flag.

Project Overview

Edison Energy was building the central utility plant that supplies chilled and hot water to Adventist HealthCare's new White Oak Medical Center, a facility with more than 100 beds plus laboratories and offices running around the clock. Kimball provided general contracting services for the plant's core and shell.

How We Delivered

Kimball's superintendent supervised the subcontractors on site and kept quality on track while the schedule was coordinated tightly around limited working space. The plant's utility tie-ins to the hospital followed a time-based schedule.

Steel-frame building under construction with a worker in a safety vest and hard hat.

Scope of Work

Site & Foundations

  • Performed earthwork for a one-story building with a cellar level exposed on one side

  • Poured the foundations

  • Completed the sitework

Building Shell

  • Built the one-story structure over the cellar level

  • Installed the architectural elements for the core and shell

  • Tied the new plant into the hospital's utilities

Commercial building rooftop with industrial HVAC pipes, vents, and tall exhaust stacks under a blue sky

Key Challenges

  • Working in limited space on a high-profile site with more than 50 other contractors nearby

  • Coordinating several subcontractors on site at the same time

  • Making utility tie-ins to a large new medical facility on a time-based schedule

Outcomes

  • Delivered the shell for the plant that provides chilled and hot water to the new hospital

  • Finished ahead of the medical center's fall 2019 opening

  • Supported a facility with more than 100 beds, laboratories, and offices