Wedgewood Suite H Mechanical & Electrical Upgrades
Mission-critical mechanical and electrical upgrades executed above an active, fully operational biomedical repository without disrupting research operations.
Project Overview
Kimball served as the prime contractor for HVAC and electrical upgrades to Suite H of the Wedgewood Repository Facility, an active site operated for the National Cancer Institute (NCI) and managed by Leidos Biomedical Research. The facility houses NCI's critical tissue repository in cold boxes and nitrogen freezers, where any service interruption could compromise decades of irreplaceable biomedical research. The $2.1M project included electrical demolition, installation of new panel boards, safety switches, and feeders, along with mechanical upgrades involving roof modifications, four new rooftop unit (RTU) replacements, six new condensing units, and new ductwork and insulation.
How We Delivered
Because the freezers below the work area couldn't be relocated or safely worked over, Kimball engineered a specialized scaffolding system suspended from the building's steel girders — allowing crews to safely access overhead areas without setting foot on or near the vulnerable equipment below. Temporary generators and power distribution panels were deployed to support planned outages without interrupting freezer operation, and crane operations were used to replace rooftop units while interior work proceeded in parallel.
Scope of Work
Electrical Infrastructure
✔ Demolition and replacement of panel boards, safety switches, and feeders
Temporary power via generators and distribution panels to support planned outages
Mechanical Systems
✔ Replacement of four rooftop units (RTUs) and six condensing units
✔ New ductwork and insulation
✔ Structural roof modifications to support new equipment
Site & Operations
✔ Custom scaffolding system suspended from steel girders to work above sensitive freezer equipment without disrupting it
✔ New oxygen level monitoring systems and full mechanical commissioning
✔ Integration with the facility's existing Building Automation System (BAS)
✔ Project closeout including testing, validation, and hands-on training for NCI facility staff
Key Challenges
✔ Performing rooftop and structural work directly above vital, irreplaceable research samples
✔ Avoiding any interruption to freezer and cold storage operations during construction
✔ Coordinating planned power outages without affecting mission-critical systems
✔ Operating within a fully occupied, highly sensitive biomedical research facility
Outcomes
✔ Delivered a complete HVAC and electrical upgrade with zero disruption to freezer operations
✔ Successfully executed high-risk overhead work through an innovative scaffolding solution
✔ Achieved full BAS integration and facility staff training at closeout
✔ Maintained continuous, uninterrupted research operations throughout construction