Commercial rooftop HVAC system with insulated refrigerant pipes, condenser units, and exposed heat exchanger components

Wedgewood Suite H Mechanical & Electrical Upgrades

Mission-critical mechanical and electrical upgrades executed above an active, fully operational biomedical repository without disrupting research operations.

Project Size
$2,120,205
Location
Frederick, MD
Owner
National Cancer Institute
Equipment Replaced
4 Rooftop Units, 6 Condensing Units
Freezer & Research Disruptions
Zero
Commercial rooftop HVAC equipment on a gravel-covered roof under an overcast sky

Project Overview

Kimball served as the prime contractor for HVAC and electrical upgrades to Suite H of the Wedgewood Repository Facility, an active site operated for the National Cancer Institute (NCI) and managed by Leidos Biomedical Research. The facility houses NCI's critical tissue repository in cold boxes and nitrogen freezers, where any service interruption could compromise decades of irreplaceable biomedical research. The $2.1M project included electrical demolition, installation of new panel boards, safety switches, and feeders, along with mechanical upgrades involving roof modifications, four new rooftop unit (RTU) replacements, six new condensing units, and new ductwork and insulation.

How We Delivered

Because the freezers below the work area couldn't be relocated or safely worked over, Kimball engineered a specialized scaffolding system suspended from the building's steel girders — allowing crews to safely access overhead areas without setting foot on or near the vulnerable equipment below. Temporary generators and power distribution panels were deployed to support planned outages without interrupting freezer operation, and crane operations were used to replace rooftop units while interior work proceeded in parallel.

Industrial construction interior with scaffolding, exposed HVAC ducts, steel beams, and a partially built structure

Scope of Work

Electrical Infrastructure

✔ Demolition and replacement of panel boards, safety switches, and feeders

Temporary power via generators and distribution panels to support planned outages

Mechanical Systems

✔ Replacement of four rooftop units (RTUs) and six condensing units

✔ New ductwork and insulation

✔ Structural roof modifications to support new equipment

Site & Operations

✔ Custom scaffolding system suspended from steel girders to work above sensitive freezer equipment without disrupting it

✔ New oxygen level monitoring systems and full mechanical commissioning

✔ Integration with the facility's existing Building Automation System (BAS)

✔ Project closeout including testing, validation, and hands-on training for NCI facility staff

Commercial rooftop HVAC equipment with ductwork, refrigerant piping, and open electrical control panels.

Key Challenges

✔ Performing rooftop and structural work directly above vital, irreplaceable research samples

✔ Avoiding any interruption to freezer and cold storage operations during construction

✔ Coordinating planned power outages without affecting mission-critical systems

✔ Operating within a fully occupied, highly sensitive biomedical research facility

Outcomes

✔ Delivered a complete HVAC and electrical upgrade with zero disruption to freezer operations

✔ Successfully executed high-risk overhead work through an innovative scaffolding solution

✔ Achieved full BAS integration and facility staff training at closeout

✔ Maintained continuous, uninterrupted research operations throughout construction