Industrial warehouse under construction with stacked metal panels, a crane, and an orange Doosan excavator.

Panda Hummel
Energy Station

Seven design-build support buildings delivered at one of the largest coal-to-natural gas conversions in the U.S.

Project Size
$7.2 Million
Location
Shamokin Dam, PA
Owner
Bechtel Infrastructure
Completed
June 2018
Buildings Delivered
7 Pre-Engineered Metal Buildings
Industrial construction site with workers in safety vests, heavy equipment, large storage tanks, and a partially built facility under cloudy skies.

Project Overview

Kimball was awarded a competitively bid design-build contract by Bechtel Infrastructure for seven support buildings at Panda Hummel Station, a 1,124-megawatt combined-cycle power plant fueled by natural gas. Built on the site of the retired Sunbury Generation coal-fired facility, the plant was one of the largest coal-to-natural gas conversions in the U.S.

How We Delivered

Because of the plant's overall construction schedule, Kimball executed its work in tightly sequenced phases. A full-time project manager provided on-site leadership, coordinating with the power generation team and other trades to hold schedule and site safety.

Spacious industrial warehouse interior with metal shelving, storage racks, a forklift, and an overhead yellow crane.

Scope of Work

Design-Build

  • Designed, procured, and erected all seven pre-engineered metal buildings

  • Delivered complete interior and exterior packages for each building

Administration & Maintenance Building

  • Built a 16,000 sq. ft. administration, maintenance, and warehouse facility with site preparation and structural concrete

  • Installed a mezzanine level and a five-ton overhead crane

  • Finished offices, conference rooms, and locker rooms with showers

  • Built a fully equipped control room

Power Support Buildings

  • Built the main switchgear building, the electrical building, and cooling tower support facilities, from 650 to 5,000 sq. ft.

  • Installed HVAC, insulation, louvers, and fire protection and detection systems in each

Industrial construction site with a large corrugated building, smokestacks, cranes, pipes, portable toilets, and construction vehicles.

Key Challenges

  • Working in extreme congestion with multiple contractors in the same work zone

  • Sequencing work in tight phases around the plant's overall construction schedule

  • Building on a brownfield site

Outcomes

  • Delivered all seven support buildings for a 1,124-megawatt power plant

  • Supported one of the largest coal-to-natural gas conversions in the U.S.

  • Met a demanding schedule through careful coordination and planning

Industrial facility ceiling with metal cable trays, bundled electrical wiring, fluorescent lights, and exposed structural beams.