Aerial view of an industrial power plant under construction with large steel structures, cranes, storage tanks, and electrical equipment.

Keys Energy Center

Eighty-five thousand square feet of power plant buildings erected around turbines and generators that were already in place.

Project Size
$16.8 Million
Location
Keys Energy Center, Brandywine, MD
Owner
SNC-Lavalin Power
Completed
April 2019
Facilities Delivered
85,000-plus Sq. Ft.
Steel-framed industrial facility under construction with exposed roof beams, pipes, tanks, and processing equipment under a clear blue sky

Project Overview

SNC-Lavalin Power selected Kimball as design-build contractor and prime general contractor for the vertical construction of the main Power Building and four support structures at the Keys Energy Center combined cycle power plant. Most contractors build the building first. Here the turbines and generators were already installed, and the buildings had to go up around them.

How We Delivered

Kimball developed a protection plan that encased each unit in timber framing and plywood, then sequenced construction so work moved ahead without damaging or disrupting the equipment. Crane and manlift operations, daily safety meetings, and a phased schedule kept the structure aligned with the mechanical and electrical work going on around it.

Industrial construction site with a crane lifting steel framework among metal platforms, pipes, and processing equipment under an overcast sky.

Scope of Work

Power Building

  • Erected a 52,000 sq. ft. pre-engineered metal Power Building over two natural gas turbines, two electric generators, and a steam turbine

  • Installed a 125-ton bridge crane and associated systems

Support Buildings

  • Built two electrical buildings

  • Built a warehouse with a mezzanine and a five-ton crane

  • Built an administrative building

  • Built a condensate polishing building beneath pre-installed cooling towers

Industrial processing facility with white ducts, steel framework, overhead conveyor, and large warehouse doors

Key Challenges

  • Building around installed turbines and generators that could not be damaged

  • Working beside a 450-foot pipe rack that left only 30 inches of clearance

  • Staging overlapping trades through limited access points in a high-security plant

Outcomes

  • Delivered more than 85,000 sq. ft. of facilities without damaging any installed equipment

  • Cut the impact of the pipe rack clearance by more than 30 percent by replacing cranes and manlifts with swing scaffolding and re-sequencing the schedule

  • Earned formal recognition from SNC-Lavalin for proactive problem-solving and coordination

Industrial building under construction with cranes, aerial lifts, scaffolding, and construction materials