Georgetown University
Law Center

Building systems replaced floor by floor in an occupied law school, on day and night shifts.

Project Size
$6.6 Million
Location
500 First Street NW, Washington, DC
Owner
ENGIE North America for Georgetown University
Completed
March 2026
Fan Coil Units Replaced
327 Across 9 Floors

Project Overview

Georgetown University Law Center needed its heating and cooling units replaced floor by floor without closing a building full of classrooms, faculty offices, and conference rooms. ENGIE North America, the University's energy management company, selected Kimball as prime contractor for the work at 500 First Street NW and the Williams Law Library.

How We Delivered

The schedule was built around the school. Fan coil work ran at night, with furniture moved out and back so each room reopened the next morning, and riser work was planned around exams and holidays. The tank replacement ran on day shift, with crane operations coordinated around loading dock deliveries.

Scope of Work

Mechanical Systems

  • Replaced 327 fan coil units across nine floors

  • Installed 1,300 valves and 322 access panels on the water risers

  • Installed new control cabling and thermostats tied into the building automation system

Library & Fuel Tank

  • Replaced the fan coil unit at the Williams Law Library main entrance

  • Removed and replaced the underground fuel oil tank at the loading dock

Abatement & Controls

  • Abated asbestos found on riser piping under containment

  • Installed dust control and air quality measures for drywall work

Key Challenges

  • Replacing building systems in an occupied academic facility

  • Running day and night shifts under one project team

  • Finding asbestos on riser piping mid-project

  • Coordinating crane operations and traffic at the loading dock

Outcomes

  • Returned each room to use the next morning with heating and cooling restored

  • Enabled individual risers and branches to be isolated for service

  • Returned each space to its users on schedule