Georgetown University
Fuel Oil Tank Replacement

Heavy civil and fuel system replacement executed beneath an active campus without interrupting plant operations.

Project Size
$3.4 Million
Location
Georgetown University, Washington, DC
Owner
ENGIE North America for Georgetown University
Completed
April 2025
Tanks Replaced
Two 30,000-gallon tanks
Large green underground utility pipe being installed in a construction trench between brick buildings

Project Overview

Georgetown University's Heating and Cooling Plant needed its two underground fuel oil tanks replaced, and the tanks sat beneath the main campus thoroughfare beside Cooper Field. ENGIE North America, the University's energy management company, selected Kimball as prime contractor to remove and replace both tanks and two fuel pumps while the plant and the campus around it kept running.

How We Delivered

Preparation came first: utility surveys by multiple locating companies, a work plan for soil contaminants, and shoring among dense underground utilities. Work began after May finals and was sequenced around exams, athletics, and campus events, with phased road closures keeping campus access open.

Yellow Grove mobile crane and construction equipment at a city street work zone beside a brick industrial building.

Scope of Work

Fuel Systems

  • Removed and replaced two 30,000-gallon underground fuel oil tanks and two fuel pumps

  • Installed temporary fuel systems to keep the plant in operation

Heavy Lifts & Excavation

  • Lifted out the old tanks and set the new ones with a 300-ton crane and eight tractor-trailers of counterweights

  • Excavated 15 feet deep and 100 feet long

  • Secured the excavation each night with screened fencing, locked access, and signage

  • Rebuilt the road subgrade

Key Challenges

  • Working beneath the main campus thoroughfare among dense underground utilities

  • Fitting crane lifts into limited time windows

  • Keeping the plant in operation throughout construction

  • Protecting the public around an open excavation

Outcomes

  • Replaced both 30,000-gallon tanks and both fuel pumps

  • Kept critical utilities in service throughout

  • Kept campus access open during events

  • Complied with all local inspection and permitting requirements