Construction site with concrete foundation forms, braced retaining walls, and bundled gray utility pipes.

Fort Detrick
Signal Campus

Multi-system infrastructure upgrade executed across an active, mission-critical campus without disruption.

Project Size
$58.5 Million
Location
Fort Detrick, Frederick, MD
Owner
US Army Garrison
Schedule
3 Months Early
Electrical Duct Bank Installed
7,500 Linear Feet
Industrial electrical control room with gray switchgear panels, overhead conduit, ventilation grilles, and an illuminated exit door

Project Overview

Kimball served as the prime contractor and design-build lead for this complex $58.5M infrastructure upgrade supporting the U.S. Army Signal Campus. The project included full replacement and modernization of medium voltage electrical systems, chilled water and steam generation, and distribution systems serving multiple occupied, mission-critical buildings.

How We Delivered

The project was executed through phased construction and carefully coordinated utility cutovers across an active, mission-critical campus. Work was strategically sequenced to maintain continuous operation of critical systems, requiring detailed planning, real-time coordination, and close alignment with facility stakeholders.

Workers use a crane to install large gray electrical equipment on a flatbed truck beside a brick building.

Scope of Work

Electrical Infrastructure

✔ Installed 7,500 linear feet of electrical duct banks (up to 20 5.5" conduits, 15.5’ deep)

✔ Installed (8) electrical unit substations and (6) pad-mounted transformers

Mechanical Systems

✔ Delivered and installed (2) 410-ton chillers and (3) 3,122 MBH boilers in containerized units

Utilities Distribution

✔ Installed new steam and chilled water distribution lines from the CUP to end-user buildings

✔ Connected new mechanical and electrical systems to existing campus infrastructure

Site & Operations

✔ Performed work in both secure and non-secure areas

✔ Maintained active utility service across occupied facilities throughout construction 

Underground utility conduit installation in a construction trench with bundled white pipes and concrete encasements

Key Challenges

✔ Maintaining uninterrupted utility service across occupied, mission-critical facilities
✔ Executing complex cutovers and system transitions in coordination with mission managers
✔ Working within aging infrastructure requiring careful integration with new systems
✔ Operating under strict access controls in a secure government environment

Outcomes

✔ Delivered a complete turnkey infrastructure solution ahead of schedule
✔ Completed construction 3 months early
✔ Achieved all major system transitions without unplanned disruptions
✔ Maintained continuous operation of critical campus facilities throughout the project
✔ Provided full site safety oversight, QA/QC, and schedule control

White utility pipes installed in a trench beneath yellow shoring panels, secured with metal reinforcement and cross braces.