Fort Detrick
Signal Campus
Multi-system infrastructure upgrade executed across an active, mission-critical campus without disruption.
Project Overview
Kimball served as the prime contractor and design-build lead for this complex $58.5M infrastructure upgrade supporting the U.S. Army Signal Campus. The project included full replacement and modernization of medium voltage electrical systems, chilled water and steam generation, and distribution systems serving multiple occupied, mission-critical buildings.
How We Delivered
The project was executed through phased construction and carefully coordinated utility cutovers across an active, mission-critical campus. Work was strategically sequenced to maintain continuous operation of critical systems, requiring detailed planning, real-time coordination, and close alignment with facility stakeholders.
Scope of Work
Electrical Infrastructure
✔ Installed 7,500 linear feet of electrical duct banks (up to 20 5.5" conduits, 15.5’ deep)
✔ Installed (8) electrical unit substations and (6) pad-mounted transformers
Mechanical Systems
✔ Delivered and installed (2) 410-ton chillers and (3) 3,122 MBH boilers in containerized units
Utilities Distribution
✔ Installed new steam and chilled water distribution lines from the CUP to end-user buildings
✔ Connected new mechanical and electrical systems to existing campus infrastructure
Site & Operations
✔ Performed work in both secure and non-secure areas
✔ Maintained active utility service across occupied facilities throughout construction
Key Challenges
✔ Maintaining uninterrupted utility service across occupied, mission-critical facilities
✔ Executing complex cutovers and system transitions in coordination with mission managers
✔ Working within aging infrastructure requiring careful integration with new systems
✔ Operating under strict access controls in a secure government environment
Outcomes
✔ Delivered a complete turnkey infrastructure solution ahead of schedule
✔ Completed construction 3 months early
✔ Achieved all major system transitions without unplanned disruptions
✔ Maintained continuous operation of critical campus facilities throughout the project
✔ Provided full site safety oversight, QA/QC, and schedule control