Fast-track office build-out executed above active operations to expand pandemic response capacity.
Project Overview
Emergent BioSolutions selected Kimball for a fast-track interior build-out of 7,000 square feet of previously unfinished gray space at its Baltimore facility. As the COVID-19 pandemic intensified, Emergent urgently needed to expand capacity to support treatment and vaccine development. Having worked with Emergent before and shown success in occupied, sensitive environments, Kimball was awarded the contract.
How We Delivered
Access was highly constrained because of operations on the floors below. Kimball removed the entire curtainwall on the north facade and installed a stair tower in the opening for isolated access to the second floor, with temporary partitions on both levels maintaining building security and environmental separation.
Scope of Work
Demolition & Interiors
Demolished floor finishes, drywall, ductwork, and lighting across 7,000 sq. ft.
Built new metal stud framing, drywall partitions, coatings, and finishes
Mechanical & Electrical
Installed new restrooms and air terminal units
Modified HVAC and fire suppression for the new layout
Installed new lighting, power distribution, and fire alarm integration
Installed low-voltage infrastructure
Key Challenges
Working with highly constrained access above active operations
Delivering on a compressed, pandemic-driven schedule
Protecting ongoing research on the floors below
Outcomes
Delivered a fully functional office suite for more than 50 administrative and research personnel
Enabled Emergent to double its staffing during a critical time for public health response
Completed the project without disruption to ongoing research