Steel mezzanine framing under construction inside a warehouse, with a forklift and worker on a scissor lift.

Dreyer's Ice Cream
Locker Room Renovation

Four phases of locker room and tank alley upgrades built around production shifts at an ice cream manufacturing plant

Project Size
$2.1 Million
Location
Dreyer's Ice Cream Plant, Laurel, MD
Owner
Dreyer's Grand Ice Cream, Inc.
Completed
Fall 2023
Final Punch List
None
Blue lockers in a brightly lit school locker room

Project Overview

Dreyer's Ice Cream plant in Laurel, Maryland needed its locker room facilities renovated and expanded while production continued. Kimball was general contractor for a project that began as a five-month job and grew when the owner directed added scope.

How We Delivered

Kimball sequenced the work in four phases around production shifts and the tank alley's operating schedule, enforcing dust and air quality controls throughout. Real-time walkthroughs and rolling approvals meant the project closed out without a final punch list.

Empty industrial warehouse interior with polished concrete floor, exposed HVAC ductwork, fluorescent lights, and yellow safety railings

Scope of Work

Phase 1: Maintenance Relocation

  • Demolished the existing maintenance spaces

  • Built a new mezzanine to house maintenance operations

Phase 2: New Locker Room

  • Built a new locker room in the former maintenance area, with partitions and MEP upgrades

  • Installed a rooftop HVAC unit for improved climate control

Phase 3: Existing Locker Rooms

  • Renovated the existing locker rooms one room at a time so lockers stayed available

  • Reconfigured wall layouts, flooring, plumbing, lighting, and finishes

Phase 4: Tank Alley

  • Installed wash basins, plumbing systems, backfill, and new flooring

  • Added a pedestrian door to improve worker safety and flow

Workers use a crane to load a large white equipment unit onto a flatbed truck along a commercial street.

Key Challenges

  • Working around production shifts and food safety regulations

  • Scheduling around operations in the tank alley

  • Controlling dust and air quality in an active food plant

  • Keeping locker rooms available while each one was renovated

Outcomes

  • Delivered modernized, expanded locker facilities for plant employees

  • Closed out without a final punch list

  • Finished under budget without disrupting plant operations