CSX Coal Terminal
North Tunnel Reclamation
Tunnel walls, slabs, and five stacking towers rebuilt after an explosion forced part of the Baltimore coal pier offline.
Project Overview
After an explosion at the CSX Coal Pier in Baltimore forced part of the facility offline, PCL engaged Kimball to reclaim the North Tunnel and repair five stacking towers so coal handling could resume. The work covered a 25,000 sq. ft. site.
How We Delivered
Kimball self-performed the work in sequential phases, with extensive shoring and rigging, dowel installation, and large-volume pours. Each phase was formed, poured, cured, and backfilled before the next began, all while coal yard operations continued around the crews.
Scope of Work
North Tunnel
Formed and poured new walls, slabs, stack protection collars, and aprons
Installed shoring, rigging, and dowels for each tunnel segment
Backfilled each segment after the concrete cured
Stacking Towers
Repaired five stacking towers with new feeder openings, wall forms, decking, and rebar
Installed epoxy-coated rebar
Poured and cured slabs and ring walls, then backfilled each tower
Key Challenges
Working below grade with limited access
Rigging and forming to exact requirements for large-volume pours
Building around ongoing coal yard operations
Outcomes
Restored the North Tunnel and five stacking towers critical to the pier's operations
Placed pours exceeding 200 cubic yards in a single section