Construction workers in safety gear build wooden concrete formwork around a large industrial structure.

CSX Coal Terminal
North Tunnel Reclamation

Tunnel walls, slabs, and five stacking towers rebuilt after an explosion forced part of the Baltimore coal pier offline.

Project Size
$4.2 Million
Location
CSX Coal Pier, Baltimore, MD
Client
PCL
Completed
May 2023
Largest Single Pour
200+ Cubic Yards
Industrial construction site with tall concrete support towers, overhead conveyors, heavy equipment, and a worker under a blue sky

Project Overview

After an explosion at the CSX Coal Pier in Baltimore forced part of the facility offline, PCL engaged Kimball to reclaim the North Tunnel and repair five stacking towers so coal handling could resume. The work covered a 25,000 sq. ft. site.

How We Delivered

Kimball self-performed the work in sequential phases, with extensive shoring and rigging, dowel installation, and large-volume pours. Each phase was formed, poured, cured, and backfilled before the next began, all while coal yard operations continued around the crews.

Construction site with tall concrete bridge columns, a newly poured roadway ramp, workers, and industrial buildings under a clear blue sky

Scope of Work

North Tunnel

  • Formed and poured new walls, slabs, stack protection collars, and aprons

  • Installed shoring, rigging, and dowels for each tunnel segment

  • Backfilled each segment after the concrete cured

Stacking Towers

  • Repaired five stacking towers with new feeder openings, wall forms, decking, and rebar

  • Installed epoxy-coated rebar

  • Poured and cured slabs and ring walls, then backfilled each tower

Construction site with a large red crawler crane, concrete columns, excavated soil, and a partially built concrete foundation.

Key Challenges

  • Working below grade with limited access

  • Rigging and forming to exact requirements for large-volume pours

  • Building around ongoing coal yard operations

Outcomes

  • Restored the North Tunnel and five stacking towers critical to the pier's operations

  • Placed pours exceeding 200 cubic yards in a single section

  • Completed the project with zero safety incidents

Construction site showing a concrete foundation wall reinforced with steel rebar, wooden formwork, and orange rebar safety caps beside exposed rock and soil.