Green metal industrial building with covered entrance, rooftop piping, and outdoor YORK HVAC unit

Croda Mantis Project

Three pre-engineered metal buildings for a control room and laboratory, fire pump station, and manufacturing equipment at a secure industrial site.

Project Size
$2.9 Million
Location
New Castle, DE
Client
Walbridge Aldinger Co.
Completed
2018
Facilities Delivered
3 Pre-Engineered Metal Buildings
Bright hospital hallway with ECO Range branding, informational posters, tiled floors, and green double doors

Project Overview

Walbridge Aldinger, a multinational engineering and construction management firm, selected Kimball to deliver three buildings for Croda's Mantis project in New Castle, Delaware. The buildings house a control room with laboratory, a fire pumping station, and steam compressor and manufacturing equipment.

How We Delivered

Kimball worked with NuTec Design Associates to lead the design and erection of all three buildings. As general contractor, Kimball managed delivery logistics, subcontractor sequencing, and schedule control inside a high-security site.

Office break room with wooden cabinets, sink, coffee station, water cooler, round table, and double doors

Scope of Work

Site & Structure

  • Excavated, graded, and installed utilities and concrete foundations

  • Erected structural steel for all three buildings

  • Installed metal roof and wall panels, exterior doors, frames, and hardware

Interiors

  • Installed rough and finish carpentry and prepared the buildings for mechanical, electrical, and equipment-specific contractors

  • Built out the laboratory with custom casework and proprietary experimental equipment

Clean modern laboratory with workbenches, analytical equipment, storage cabinets, sinks, and fluorescent lighting

Key Challenges

  • Coordinating deliveries and subcontractors under a high-security site's access rules

  • Building three different building types, each for different process equipment

  • Fitting out a laboratory around proprietary experimental equipment

Outcomes

  • Delivered three buildings for a regulated industrial operation under one design-build contract

  • Handed over a laboratory fitted with custom casework and experimental equipment

  • Prepared each building for the equipment contractors who followed

Modern operations control room with multiple computer workstations, office chairs, and a large wall-mounted multi-screen display.