CPV St. Charles
Plant Buildings

Administration and water treatment buildings designed and built in one design-build contract for a Maryland power plant.

Project Size
$3.5 Million
Location
Charles County, MD
Owner
SNC-Lavalin Power
Delivery Method
Design-Build
Facilities Delivered
2 (18,800 Sq. Ft.)

Project Overview

SNC-Lavalin Power needed an administration building and a stand-alone water treatment building for the CPV St. Charles plant in Charles County, Maryland. Kimball provided the civil, structural, and architectural design as well as the construction, as general contractor.

How We Delivered

Design began with conceptual drawings for the Charles County Planning Board, followed by full architectural and engineering plans that built in equipment manufacturers' recommendations. Kimball then self-managed direct labor and on-site supervision, with subcontractors for electrical, mechanical, and other trades.

Scope of Work

Site & Structure

  • Excavated, graded, and installed underground utilities and building foundations for both buildings

  • Erected a 14,400 sq. ft. administration building and a 4,800 sq. ft. water treatment building with pre-engineered metal systems, structural steel framing, metal siding, and roofing

  • Installed a complete lightning protection system

Interiors & Systems

  • Installed rough and finish carpentry, wallboard, acoustical ceilings, hardware, and trim

  • Installed painted finishes, cabinets, lighting, and fixtures

  • Installed raised access floors in the control and electrical rooms

  • Installed a full HVAC system and communication and electrical wiring

  • Installed fire protection systems in both buildings

Steel-frame commercial building under construction with cranes, construction equipment, workers, and safety fencing

Key Challenges

  • Taking a project from concept drawings through county planning board review to construction

  • Coordinating civil, structural, architectural, mechanical, and electrical design for two different building types

  • Building raised-floor control and electrical rooms to a power plant's standards

Outcomes

  • Delivered two plant buildings totaling 18,800 sq. ft. under one design-build contract

  • Turned over both buildings with fire protection systems tested and ready for inspection

  • Incorporated equipment manufacturers' recommendations into the final design