BGE Baltimore Administration Building Window Replacement
One hundred thirty windows replaced in an occupied downtown Baltimore high-rise, mostly from the inside
Project Overview
Exelon BGE needed 130 windows replaced at its historic high-rise office building in downtown Baltimore while employees kept working inside. Kimball served as general contractor for the demolition, abatement, and replacement.
How We Delivered
Kimball staged the work from the interior to match employee relocation schedules coordinated with BGE and KGO, and held planning meetings weekly or more often. Noise and dust controls, including poly barriers, HEPA filtration, and scheduled cleanings with inspections after each phase, kept the floors usable.
Scope of Work
Demolition & Abatement
Demolished and abated the area around each window opening
Removed and replaced drywall, drop ceilings, mechanical systems, and plumbing
Relocated studs and rerouted mechanical lines found inside the walls
Cut and capped piping, then patched and painted as needed
Windows & Restoration
Replaced 130 windows
Restored the concrete facade after window installation
Replaced portions of the aging ceiling systems and upgraded interiors
Key Challenges
Working in an occupied office building with employees on the floor
Finding and rerouting mechanical lines inside the walls
Controlling noise, dust, and abatement around each opening
Following enhanced COVID-19 safety protocols
Outcomes
Replaced 130 windows in a historic high-rise without displacing daily operations
Self-performed much of the demolition and abatement work
Modernized interiors and restored the concrete facade