B560 Laboratory
Wings 1 and 3
Phased laboratory renovations executed inside an occupied, high-security research building.
Project Overview
Kimball completed the phased renovation of six laboratories across multiple floors and wings of Building 560 at the National Cancer Institute in Fort Detrick. The project was delivered for Leidos Biomedical Research, Inc. and aimed to modernize research environments while maintaining active operations in the facility.
How We Delivered
Kimball used a phased construction approach, coordinating access, timing, and environmental controls with NCI stakeholders. Construction was completed over seven months, from October 2021 through April 2022.
Scope of Work
Interior Renovation
Renovated 1,743 sq. ft. in Wing 1 (second floor) and Wing 3 (first floor)
Replaced all doors and frames and installed new laboratory casework
Removed and reconfigured interior walls and repaired and refinished surfaces
Installed suspended acoustic ceilings and vinyl composition tile flooring
Building Systems
Upgraded lighting
Completed significant HVAC upgrades for performance and occupant comfort
Key Challenges
Working inside an occupied, high-security laboratory building
Protecting sensitive ongoing research from disruption
Phasing renovations across multiple floors and wings
Outcomes
Modernized research environments while maintaining active operations
Delivered precise, minimally disruptive renovations in an active research facility