Large blank billboard mounted on a tall support pole above an industrial street with utility lines and a worker in a safety vest

Building 1040
Generator Replacement

A phased emergency power installation delivering uninterrupted backup power to a mission-critical research facility.

Project Size
$5,137,595
Location
Fort Detrick, MD
Owner
National Cancer Institute
Successful Scheduled Outages
More Than 20
All Milestones Met
On Time / On Budget
Construction workers in safety vests install utility conduits in a deep trench beside an excavator.

Project Overview

When Leidos Biomedical identified the need for a critical backup power system for Building 1040 on the Fort Detrick campus, Kimball Construction was selected as prime contractor for the $5.1M project, installing a complete emergency generator system to support the National Cancer Institute's operations. Because the building remained fully active and required constant power throughout construction, the project demanded far more than a standard generator swap: it called for a precise, phased approach to keep research operations uninterrupted the entire time.

How We Delivered

Kimball worked closely with Leidos Biomedical and Fort Detrick leadership during preconstruction to develop a detailed phased plan, identifying opportunities to streamline procurement and installation, including integrating a diesel particulate filter (DPF) and building specialized concrete pads for the generator and related equipment. These adjustments tightened the schedule while allowing the new system to be woven into existing facility infrastructure with minimal impact to ongoing operations.

On-site, the team coordinated more than 20 scheduled building outages to keep power flowing to mission-critical areas while the generator and electrical systems were integrated. Kimball also managed full system commissioning, testing, and regulatory inspections to confirm the work met government specifications and safety standards.

Utility workers in high-visibility clothing install equipment at an industrial facility on a rainy day.

Scope of Work

Power Systems

✔ Installed a complete emergency generator system for Building 1040

✔ Integrated a diesel particulate filter (DPF) into the system design

Site & Structural

✔ Constructed specialized concrete pads for the generator and associated equipment

Site & Operations

✔ Coordinated over 20 scheduled building outages to maintain power to mission-critical areas

✔ Full system commissioning, testing, and regulatory inspections

Construction workers near a large gray temporary building, orange safety cones, and rooftop industrial equipment.

Key Challenges

✔ Keeping the building fully operational with constant power throughout construction

✔ Integrating new generator and electrical systems into existing facility infrastructure with minimal disruption

✔ Executing 20+ outages on a tight schedule without affecting critical research functions

✔ Meeting all government specifications and safety standards through inspection and commissioning

Outcomes

✔ Completed on time and within budget, with all milestones met

✔ Facility operations remained uninterrupted throughout construction

✔ Zero disruption to the National Cancer Institute's ongoing research

Workers use a crane to lift a large steel beam over a flatbed trailer at an industrial facility.