Building 77H Cooling Tower Replacement, Philadelphia Naval Yard
Site, structural, and concrete work supporting a cooling tower replacement for mission-critical mechanical and electrical systems.
Project Overview
Kimball performed comprehensive site and structural work to support a cooling tower installation and associated infrastructure upgrades at the Philadelphia Naval Yard. The project included demolition, excavation, and concrete work across site and interior areas.
How We Delivered
The scope began with site preparation, including cutting and stockpiling topsoil, excavation, and removal of buried piping, duct banks, and water lines. Kimball then built the cooling tower structure and upgraded stormwater drainage to manage runoff and protect the site's integrity.
Scope of Work
Site & Utilities
Cut and stockpiled topsoil and excavated the site
Removed buried piping, duct banks, and water lines
Upgraded stormwater drainage with new manholes and stone swales
Cooling Tower Structure
Formed, placed, and finished new electrical duct banks and precast concrete piers
Placed stone for pile supports and built pile caps, grade beams, and slab-on-grade and wall systems
Installed a waterstop at all construction joints in the cooling tower basin
Interior Work
Demolished and rebuilt seven mechanical pads and three electrical pads for new equipment and updated layouts
Key Challenges
Excavating with precision around buried piping, duct banks, and water lines
Building complex concrete systems that hold water over the long term
Rebuilding equipment pads to fit new equipment and facility layouts
Outcomes
Delivered the structural foundation for new mission-critical mechanical and electrical equipment
Provided long-term water containment and durability in the cooling tower basin
Rebuilt ten equipment pads for updated facility layouts