Industrial facility with large insulated metal pipes, valves, ductwork, and a white cylindrical processing tank under a clear blue sky

Building 77H Cooling Tower Replacement, Philadelphia Naval Yard

Site, structural, and concrete work supporting a cooling tower replacement for mission-critical mechanical and electrical systems.

Project Size
$2.3 Million
Location
Philadelphia Naval Yard, Philadelphia, PA
Owner
Green Contracting Co.
Completed
September 2018
Equipment Pads Rebuilt
7 Mechanical, 3 Electrical

Project Overview

Kimball performed comprehensive site and structural work to support a cooling tower installation and associated infrastructure upgrades at the Philadelphia Naval Yard. The project included demolition, excavation, and concrete work across site and interior areas.

How We Delivered

The scope began with site preparation, including cutting and stockpiling topsoil, excavation, and removal of buried piping, duct banks, and water lines. Kimball then built the cooling tower structure and upgraded stormwater drainage to manage runoff and protect the site's integrity.

Exterior of a large industrial facility with metal bleachers, stair tower, and rooftop railings under a clear blue sky

Scope of Work

Site & Utilities

  • Cut and stockpiled topsoil and excavated the site

  • Removed buried piping, duct banks, and water lines

  • Upgraded stormwater drainage with new manholes and stone swales

Cooling Tower Structure

  • Formed, placed, and finished new electrical duct banks and precast concrete piers

  • Placed stone for pile supports and built pile caps, grade beams, and slab-on-grade and wall systems

  • Installed a waterstop at all construction joints in the cooling tower basin

Interior Work

  • Demolished and rebuilt seven mechanical pads and three electrical pads for new equipment and updated layouts

Industrial processing facility with storage tank, pipes, metal structures, and yellow safety ladders under a clear blue sky

Key Challenges

  • Excavating with precision around buried piping, duct banks, and water lines

  • Building complex concrete systems that hold water over the long term

  • Rebuilding equipment pads to fit new equipment and facility layouts

Outcomes

  • Delivered the structural foundation for new mission-critical mechanical and electrical equipment

  • Provided long-term water containment and durability in the cooling tower basin

  • Rebuilt ten equipment pads for updated facility layouts